Horizontal Wells - Applications in Mature Production Areas and
A Kansas Field Demonstration

05/10/2001

Saibal Bhattacharya, Kansas Geological Survey
Richard Pancake, Tertiary Oil Recovery Project
Paul Gerlach, Kansas Geological Survey

Download presentation

Table of Contents

  • Title
  • Outline
  • Identifying candidate applications Production data - oil cut changes
  • Identifying candidate applications Production data - IP & Cumulative data
  • Identifying candidate applications Primary & Infill Production data
  • Identifying candidate applications Primary & Infill Production data
  • Identifying candidate applications Geologic mapping - structure & derivative
  • Identifying candidate applications Geologic mapping - structure & derivative
  • Identifying candidate applications Integrating Production & Geologic data
  • Identifying candidate applications Field level volumetrics - OOIP/Qtr section
  • Identifying candidate applications Field level volumetrics - Rec. Eff/Qtr section
  • Identifying candidate applications Lease Level Volumetrics - Recovery factors
  • Identifying candidate applications Lease Level Volumetrics - Recovery factors
  • Outline - Tools for identifying candidate applications
  • Reservoir Characterization Geologic Model
  • Reservoir Characterization Reservoir Model
  • Reservoir Characterization - Storativity
  • Engineering Analysis Production History Reconstruction
  • Engineering Analysis Reservoir Simulation - History Match
  • Reservoir Simulation Mapping Residual Potential
  • Performance Prediction Performance Prediction - Infill
  • Outline - Field demonstration - horizontal infill well
  • Original Plugged Well
  • Set Whipstock - Mill Casing
    • Running whipstock and starting mill
  • Drill Build Section
  • Drill Lateral Section
    • Directional Drilling Assembly
    • Installing MWD Tool
    • Directional Drilling Trailer
  • Reservoir Heterogeneity
  • Final Completion
  • Breakdown of Rig Time
  • Drilling & Completion Costs
  • Initial Production
  • Initial Production Problems
  • Complete Production Loss
  • Workover Operations - 1
    • Halliburton coiled tubing and nitrogen foam equipment
    • Weatherford 2.6" mill and mud motor
    • Testing 1 1/2" jetting nozzle
  • Workover Operations - 2
  • Lessons Learned
  • Applying What We Learned