Horizontal Drilling in Kansas
A Case Study Revisted
Presented at
TORP's 14th Oil Recovery
Conference
Wichita, Kansas
March 14-15, 2001
Mark Shreve, Mull Drilling Company
For Additional Information Contact
Tim Carr
Download Presentation (PowerPoint)
(PDF)
Table of Contents
- Horizontal
Drilling in Kansas: A Case Study
- Acknowledgements
- Additional
Acknowledgements
- Potential
Target - State Level
- Potential
Target - Mississippian
- Potential
Target - Regional Level
- Ness City
North Field - Local Level
- Doing Our
Homework
- Reservoir
Characterization Geologic Model
- Reservoir
Characterization Initial Reservoir Model
- Engineering
Analysis Reservoir Simulation - History Match
- Reservoir
Simulation Residual Potential - So-ft, 2000
- Performance
Prediction Performance Prediction - Infill
- Details of
Well Work
- Original
Plugged Well
- Drill Out
Cement & Set CIBP
- Setting
CIBP below Whipstock
- Set Whipstock
- Mill Casing
- Running
Whipstock and Starting Mill
- Drill Build
Section
- Directional
Drilling Assembly
- Installing
MWD Tool
- Drill Lateral
Section
- Directional
Drilling Trailer
- Reservoir
Heterogeneity
- Set Liner
- Running 3
1/2" CS Hydril Liner
- Final
Completion
- Initial
Production
- Breakdown of
Rig Time
- Drilling
& Completion Costs
- Intial
Production Problems
- Complete
Production Loss
- Workover
Operations - Attempted Cleanout with Coiled Tubing and Foam Unit
- Halliburton
Coiled Tubing and Nitrogen Foam Equipment
- Coiled
Tubing Drum and Control Room
- Coiled
Tubing Control Panel
- Halliburton
Nitrogen Foam Unit
- Weatherford
2.6" Mill and Mud Motor
- Testing 1
1/2" Jetting Nozzle
- Preparing
to Run in Hole with more Aggressive 2 3/4" Bit and Mud Motor
- Workover
Operations - Ran 2 3/8" Liner
- Lessons
Learned for Horizontal Well
- Applying What
We Learned
- Pfannenstiel
A #2-24 Workover
- Recompletion
- Photograph
Updated May 2001
Send comments and/or suggestions concerning content
to:
webadmin@kgs.ku.edu